Marcia (2011) Community capacity on rainwater harvesting implementation in Bandung, Indonesia. Master thesis.
|
Text
Thesis_Marcia_14_Sept_2011.pdf Download (563kB) | Preview |
Abstract
Based on Bandung condition, rainwater harvesting is one of the solution for water problem in Bandung. Unfortunately, this application is still not implemented in most of Bandung community. This study aims to identify the capacity of Bandung community to support rainwater harvesting implementation. Through descriptive analysis of intellectual, social network, and political capital, it is found that Bandung community capacity is still not sufficient for rainwater harvesting implementation. But, it also found some factors that potential to support rainwater harvesting implementation in the future. This study gives recommendation based on the potency of Bandung community capacity.
Item Type: | Thesis (Master) |
---|---|
Degree programme: | Environmental & Infrastructure Planning |
Supervisor: | Abdelwahab, M |
Date Deposited: | 23 Apr 2020 05:25 |
Last Modified: | 23 Apr 2020 05:25 |
URI: | https://frw.studenttheses.ub.rug.nl/id/eprint/1221 |
Actions (login required)
View Item |