Explaining cost overrun in infrastructure projects

Goodijk, J.D. (2019) Explaining cost overrun in infrastructure projects. Master thesis.

[img]
Preview
Text
Master_thesis_final_version.pdf

Download (1MB) | Preview

Abstract

Cost overrun is common among infrastructure projects, and can be a result of different causes. There is a research gap in which configuration of conditions have an effect on cost overrun in public-private partnerships (PPPs). The conditions that will be used to analyze the outcome (cost overrun) are: (1) contract type; (2) type of stakeholder management; (3) proper risk allocation; (4) project size. The research method is a qualitative comparative analysis (QCA). The results indicate that D&C contracts in combination with an improper risk allocation and a relative small project size (between €120 million and €410 million) lead to cost overrun. The results also give a solution for cost underrun, consisting of two solution terms. The DBFM contract in combination with process management and a proper risk allocation, and a DBFM contract with a proper risk allocation and a large project size lead to cost underrun.

Item Type: Thesis (Master)
Degree programme: Environmental & Infrastructure Planning
Supervisor: Verweij, S. and Leendertse, W.L.
Date Deposited: 23 Apr 2020 05:47
Last Modified: 23 Apr 2020 05:47
URI: https://frw.studenttheses.ub.rug.nl/id/eprint/3126

Actions (login required)

View Item View Item