Homans, Gijs Willem (2022) Construction of a new ring road in the southern part of Groningen: How are potential social impacts managed? Bachelor thesis.
|
Text
Final Version_Bachelor Thesis GWSH.pdf Download (1MB) | Preview |
Abstract
Groningen’s construction of the southern ring road must ensure that the flow of traffic in the Northern part of the Netherlands will go smoothly, without major delays. Also, it creates a new green public space that connects several parts of the city. The megaproject has had an eventful history in which various technical and financial problems arose. This resulted in an increase in expenses and a delay in completion. In addition, social issues for stakeholders aggravated. In this thesis, a two-sided mixed-method approach researched how potential social issues for the local residents were managed throughout the project. Although a Social Impact Assessment (SIA) was never fully undertaken, aspects of this process that are in line with Dutch legislation were implemented to efficiently solve social issues. Semi-structured interviews with experts stressed the importance of communication. Via a questionnaire, the perception of the local residents about the communication towards them was asked. Good communication disseminated through various means towards local residents is seen as a key element for the management of social issues.
Item Type: | Thesis (Bachelor) |
---|---|
Degree programme: | Human Geography and Planning |
Supervisor: | Hanna de Almeida Oliveira, P. |
Date Deposited: | 18 Aug 2022 12:32 |
Last Modified: | 18 Aug 2022 12:32 |
URI: | https://frw.studenttheses.ub.rug.nl/id/eprint/3971 |
Actions (login required)
View Item |