Javascript must be enabled for the correct page display

Building adaptive capacity in project management strategies in a MIRT institutional context. A case study research into project management principles.

Van Mastrigt, C. (2019) Building adaptive capacity in project management strategies in a MIRT institutional context. A case study research into project management principles. Master thesis.

[img]
Preview
Text
Thesis_Final_CaspervanMastrigt.pdf

Download (1MB) | Preview

Abstract

The MIRT programme and the ideas of complexity and aligning uncertain and unpredictable behaviour of components of a complex adaptive system are contrasting. Therefore, project managers try to find management strategies in order to deal with the duality of control and flexibility. Seven challenges are derived from practice, regarding a tight planning, dealing with a fixed budget, an unclear project description, the continuity of the project management team, the lengthy decision-making process, how organizations deal with the formal institutions and dealing with wicked problems. The theory is suggesting three categories of adaptive measures, that increase the flexibility in the planning process, hence, helping project managers to deal with uncertainty. First, creative capacity ensures a variety of pathways by giving multiple actors and levels access to the planning process. Secondly, learning capacity helps organizations recognizing a changing context faster, hence, accelerate the adaptation process. Thirdly, cooperative capacity initiates a shared vision.

Item Type: Thesis (Master)
Degree programme: Environmental & Infrastructure Planning
Supervisor: Leendertse, W.L.
Date Deposited: 23 Apr 2020 05:18
Last Modified: 23 Apr 2020 05:18
URI: https://frw.studenttheses.ub.rug.nl/id/eprint/641

Actions (login required)

View Item View Item