@phdthesis{theses_frw3126, year = {2019}, title = {Explaining cost overrun in infrastructure projects}, author = {J.D. Goodijk}, url = {https://frw.studenttheses.ub.rug.nl/3126/}, abstract = {Cost overrun is common among infrastructure projects, and can be a result of different causes. There is a research gap in which configuration of conditions have an effect on cost overrun in public-private partnerships (PPPs). The conditions that will be used to analyze the outcome (cost overrun) are: (1) contract type; (2) type of stakeholder management; (3) proper risk allocation; (4) project size. The research method is a qualitative comparative analysis (QCA). The results indicate that D\&C contracts in combination with an improper risk allocation and a relative small project size (between ?120 million and ?410 million) lead to cost overrun. The results also give a solution for cost underrun, consisting of two solution terms. The DBFM contract in combination with process management and a proper risk allocation, and a DBFM contract with a proper risk allocation and a large project size lead to cost underrun.} }