eprintid: 3126 rev_number: 1 eprint_status: archive userid: 1 dir: disk0/00/00/31/26 datestamp: 2020-04-23 05:47:17 lastmod: 2020-04-23 05:47:17 status_changed: 2020-04-23 05:47:17 type: thesis metadata_visibility: show creators_name: Goodijk, J.D. title: Explaining cost overrun in infrastructure projects ispublished: pub full_text_status: public abstract: Cost overrun is common among infrastructure projects, and can be a result of different causes. There is a research gap in which configuration of conditions have an effect on cost overrun in public-private partnerships (PPPs). The conditions that will be used to analyze the outcome (cost overrun) are: (1) contract type; (2) type of stakeholder management; (3) proper risk allocation; (4) project size. The research method is a qualitative comparative analysis (QCA). The results indicate that D&C contracts in combination with an improper risk allocation and a relative small project size (between €120 million and €410 million) lead to cost overrun. The results also give a solution for cost underrun, consisting of two solution terms. The DBFM contract in combination with process management and a proper risk allocation, and a DBFM contract with a proper risk allocation and a large project size lead to cost underrun. date: 2019 date_type: published thesis_type: master degree_programme: EIP tutors_name: Verweij, S. tutors_name: Leendertse, W.L. keywords_local: Stakeholder management keywords_local: Contract type keywords_local: Cost overrun keywords_local: Public-private partnerships keywords_local: Infrastructure projects keywords_local: Risk allocation keywords_local: Project size language_iso: en titleorder: Explaining cost overrun in infrastructure projects dbi: 5d8b4b49a378f imported_item: yes date_of_import: 2020-04-22 imported_from: http://scripties.frw.eldoc.ub.rug.nl/root/ma/EIP/2019/jdgoodijk/ import_source_file: theses-frw-20200422132455-5d8b4b49a378f.xml date_issued: 2019-01-01 description_company: Rijksuniversiteit Groningen citation: Goodijk, J.D. (2019) Explaining cost overrun in infrastructure projects. Master thesis. document_url: https://frw.studenttheses.ub.rug.nl/3126/1/Master_thesis_final_version.pdf