eprintid: 3638 rev_number: 5 eprint_status: archive userid: 1 dir: disk0/00/00/36/38 datestamp: 2021-08-05 12:01:01 lastmod: 2021-08-05 12:01:01 status_changed: 2021-08-05 12:01:01 type: thesis metadata_visibility: show sword_depositor: 1 creators_name: Wubbels, M.B. creators_id: S3432424 creators_email: matijnwubbels@gmail.com title: Cost performance analysis between Design-Build and Design-Bid-Build projects in The Netherlands ispublished: unpub full_text_status: public abstract: Despite extensive research efforts by academics over the years to provide clarity on cost performance between Design-Build and Design-Bid-Build, much ambiguity remains. Therefore, this research aims to gain more understanding in cost performance of Design-Build and Design-Bid-Build projects in The Netherlands. This study attempts to do so by analysing 179 Design-Build and Design-Bid-Build projects statistically. The results are complemented with an interview. The statistical tests showed that 1) there is no cost performance advantage of Design-Build over Design-Bid-Build or the other way around 2) there is no relationship between project type and cost performance of contracts 3) there is a statistically significant relationship between contract owners and cost overrun. These tendencies are confirmed by the conducted interview. From the interview was concluded that declining numbers of personnel and decreasing knowledge levels among employees on the contract owners’ side lead to cost overrun. To counter cost overrun, this study recommends contract owners to invest in human resource capacity and knowledge levels among employees. date: 2021 pages: 46 thesis_type: bachelor degree_programme: TP tutors_name: Verweij, S. tutors_organization: Fac. Ruimtelijke wetenschappen, Basiseenheid Planologie tutors_email: S.Verweij@rug.nl security: validuser keywords_local: Cost performance keywords_local: Design-Build keywords_local: Design-Bid-Build keywords_local: Project delivery method language_iso: en agreed_repository: yes date_issued: 2021-08-04 citation: Wubbels, M.B. (2021) Cost performance analysis between Design-Build and Design-Bid-Build projects in The Netherlands. Bachelor thesis. document_url: https://frw.studenttheses.ub.rug.nl/3638/1/Thesis%20%28Final%20Version%29%20-%20s3432424.pdf